This is the project CAM Contracting, LLC is most proud of. This property was originally a Darden Restaurant Testing School. Pine Castle Christian Academy purchased the property for their new school location.
The two buildings floor plan had to be changed to accommodate 1st thru 12th grade educational space. We had no plans, permits or fire protection system. Amazingly, it took 100 days to do a 46,000 square foot build out with four days to spare for school to start on time.
There were five structural beams in the main hallway that had to be relocated. All the electrical, plumbing and HVAC was changed to meet building code requirements. Many rooms had to be resized, therefore there was an abundance of framing and drywall. New doors, flooring and ceiling tiles were installed. The building’s interior and exterior walls were painted.
We are forever grateful to our Lord Jesus Christ for blessing our company with this rewarding project.